Ko Samui Construction Status
The construction of Ko Samui block 2, is well under way. All bricks have been put up, and the decoration of natural stones is being put up. Next step is insolation inside the apartments.
Search properties by keywords, phrase or Property ID. (i.e "Las Colinas", "2 bedroom villa" or "1401A12").
Show all results
The construction of Ko Samui block 2, is well under way. All bricks have been put up, and the decoration of natural stones is being put up. Next step is insolation inside the apartments.